Mission Briefing Checklist

Checklist
Mission Briefing - All UA
Version / Effective Date
2.1 / 21 SEP 2026
Authority
For use in all EMHS/CDRP/DIRT UAS operations.

Mission Briefing Checklist

The Mission Briefing will be conducted before every mission, and updated per sortie as necessary.